EngAbstract |
"This project periods was from 2014/1/3 to 2014/12/31, has completed all works, including all site hydrogeological data and the surrounding environment-related test data aggregated over the years, the two times monitoring wells maintenance operations, which were 20 other well condition assessment, monitoring wells after maintenance to maintain good condition. Dry, wet period 117 times the sampling operation, water quality test results including groundwater contamination and Chuan-Liu and Xin-Kai-Laos region over control standards, are all in the control. The QA/QC checks with Jia-Mel Company and Zheng-Xiu HKUST''s in May, after the overall content quality assurance review by the auditor to perform the correction, according to. On February 6 complete waste sites north and south well operations. Tube sites surrounding the completion of the investigation in July to October garnered over control standards and regulations. Check verification work completed eight sessions, including Yo-long wood, Shun-Hing business community, CPC Li-Gang station, Lin-Sin section to number 444, CPC Chao-Zhou stations, Datong gas stations,Wan-Dan embankment beside the oil factories, mainly all because of possible contamination concerns should approach verification, another verification completion of the Sin-Shin company, which Wan-Dan embankment beside the oil factory has confirmed TPH and Zn contaminated soil, has been tube procedures, Sin-Shin company were instructed not validated job supplement to improve operations. Emergency operations were seven pollution survey, which contains six sections Liu-Chuang-Chao section to No. 984, Yenpu Township Zhen-Yu companies, Wan-Dan Di-Yong company, Jhu-Tian Township Liu-Xiang section to No. 254, Pingtung City Sin-Sing section to number 434, Kanding Township Ding-Siao section to No 428, the survey confirmed that pollution, another Kanding Township Gang-Dong section to No. 190, after investigation of groundwater As concentrations in the region have high case, please follow the Association of environmental protection Department emergency plan to investigate.33 stations have been completed for the pipe leak check operations, which found high concentrations of oil and gas stations CPC Li-Gang, subsequent verification approach not contaminated, but also on the second half to complete the review and 12 to check for the EPA to check the audit work operations, mainly for the preservation of the missing information is not complete and so, after the completion of counseling has improved. Another part of the job with the administration, on March 26, respectively, for the industrial zone, the bottom mud body competent authority, gas station operators to complete three games regulations briefing, on May 30 to complete the first field of education for the training of military units learning Conference, the other on December 11 to handle an emergency drill field operations, the implementation of soil and groundwater pollution prevention advocacy advocacy completed a total of 12 sessions of nearly 3,000 people, and the other contains a press release issued to complete the 5, 14 sessions of technical Services consulting; tube site inspections completed 449 screenings; 1 to December EPA SGM database maintenance updates and build a complete inspections notification management system database. " |